Combustible Dust and Explosion-Proof Zones 21/22

Combustible dust on site, or a classified Zone 21 / Zone 22 area?

In a classified dust atmosphere, the vacuum itself must not be an ignition source. The explosion-proof series pairs Ex-rated motors and electrics with an anti-static system designed for combustible dust environments. This assessment has the highest priority in any selection — before capacity, before power, before price.

Recommended Models

EHFD-EX series — EHFD22EX through EHFD75EX.

Alternative Options

EHTD-EX series for lighter duty, or the air-powered ERT series (ERTD70 / ERTS30) where a stable compressed-air supply is available.

Recommended Products for This Scenario

EHFD22EX

EHFD-EX 100L Heavy Duty Industrial Vacuum Cleaner with Explosion-Proof Motor and Pre-Separator

  • Power2200 W
  • Airflow320 m³/h
  • Vacuum22 kPa
  • Tank100 L
Continuous DutyExplosion-proof/ATEXHeavy DutyHigh Power SuctionLarge CapacityThree-PhaseWet & Dry
View Details
EHFD30EX

EHFD-EX 100L Heavy Duty Industrial Vacuum Cleaner with Explosion-Proof Motor and Pre-Separator

  • Power3000 W
  • Airflow380 m³/h
  • Vacuum26 kPa
  • Tank100 L
Continuous DutyExplosion-proof/ATEXHeavy DutyHigh Power SuctionLarge CapacityThree-PhaseWet & Dry
View Details
EHFD40EX

EHFD-EX 100L Heavy Duty Industrial Vacuum Cleaner with Explosion-Proof Motor and Pre-Separator

  • Power4000 W
  • Airflow410 m³/h
  • Vacuum28 kPa
  • Tank100 L
Continuous DutyExplosion-proof/ATEXHeavy DutyHigh Power SuctionLarge CapacityThree-PhaseWet & Dry
View Details
EHFD55EX

EHFD-EX 100L Heavy Duty Industrial Vacuum Cleaner with Explosion-Proof Motor and Pre-Separator

  • Power5500 W
  • Airflow530 m³/h
  • Vacuum32 kPa
  • Tank100 L
Continuous DutyExplosion-proof/ATEXHeavy DutyHigh Power SuctionLarge CapacityThree-PhaseWet & Dry
View Details
EHFD75EX

EHFD-EX 100L Heavy Duty Industrial Vacuum Cleaner with Explosion-Proof Motor and Pre-Separator

  • Power7500 W
  • Airflow540 m³/h
  • Vacuum34 kPa
  • Tank100 L
Continuous DutyExplosion-proof/ATEXHeavy DutyHigh Power SuctionLarge CapacityThree-PhaseWet & Dry
View Details
EHTD22EX

EHTD-EX 70L Industrial Vacuum Cleaner with Explosion-Proof Motor and Anti-Static Kit

  • Power2200 W
  • Airflow320 m³/h
  • Vacuum22 kPa
  • Tank70 L
Continuous DutyExplosion-proof/ATEXLightweight/CompactThree-PhaseWet & Dry
View Details
EHTD30EX

EHTD-EX 70L Industrial Vacuum Cleaner with Explosion-Proof Motor and Anti-Static Kit

  • Power3000 W
  • Airflow380 m³/h
  • Vacuum26 kPa
  • Tank70 L
Continuous DutyExplosion-proof/ATEXLightweight/CompactThree-PhaseWet & Dry
View Details
EHTD40EX

EHTD-EX 70L Industrial Vacuum Cleaner with Explosion-Proof Motor and Anti-Static Kit

  • Power4000 W
  • Airflow420 m³/h
  • Vacuum28 kPa
  • Tank70 L
Continuous DutyExplosion-proof/ATEXLightweight/CompactThree-PhaseWet & Dry
View Details
ERTD70

ERTD70 Pneumatic Industrial Vacuum Cleaner Air Operated No Electric Motor

  • PowerCompressed Air 5 - 9 bar (approx. 72 – 130 PSI / 0.5 – 0.9 MPa)
  • Tank70 L
CleanroomContinuous DutyHEPALightweight/CompactLow NoiseThree-PhaseWet & Dry
View Details
ERTS30

ERTS30 Pneumatic Industrial Vacuum Cleaner Air Operated No Electric Motor

  • PowerCompressed Air 5 - 9 bar (approx. 72 – 130 PSI / 0.5 – 0.9 MPa)
  • Tank30 L
Continuous DutyExplosion-proof/ATEXLightweight/CompactLow NoisePneumatic/Compressed AirWet & Dry
View Details
IMPORTANT NOTES

Key Reminders

01   Explosion-proof equipment does not mean flammable or explosive materials can be extracted — the material itself must be assessed first.

02   Aluminum powder and magnesium powder cannot be extracted by the current EX series.

03   EHFD30EX / 40EX / 55EX / 75EX hold whole-machine explosion-proof certificate CNEx26.3713X (Ex tb IIIC T130°C Db, AC380V/50Hz); EHFD22EX and other voltages are not covered by that certificate.

04   Stated coverage is IIIA / IIIB / IIIC dust atmospheres, Zones 21/22 — final confirmation always follows the project and certificate.

05   Air-powered machines reduce electrical spark risk but carry no whole-machine Ex certification; the project still requires assessment.